YEAR BUILT
1961
BUILDER
Nashville Bridge Company
CONFIGURATION
Straight parallel sides, raked bow and stern, radiused corners at the bow and stern and a flat deck with sheer fore and aft.
DECK EQUIPMENT
• Five (5) 42" kevel cleats
• Fitted button barrel bits on fore and aft decks
• One (1) external spud well (18" x 24" rectangular)
• Two (2) internal spud wells (12" x 24" rectangular)
• One (1) cable guide mounted on the aft port deck edge