SUPERTYFON AT 150/130 is to be fixed with four M16 bolts to an outrigger or similar construction. To avoid func-tional trouble blow the supply pipe thoroughly clean be-fore connecting to the signalling whistle.
If the pipe line above deck is longer than 100m, a primary FILTER TP
I5/2 should be installed at the foot of the mast to protect the signalling apparatus from water condensate and rust particles.
This filter is recommended to be drained regu-larly, approximately once a month.