SUPERTYFON® 150/200 is to be fixed with four M16 bolts to
an outrigger or similar construction. To avoid functional trouble
blow the supply pipe thoroughly clean before connecting to the
signalling whistle. If the pipe line above deck is longer than 100
m (328’), a primary FILTER TP 15/2 should be installed at the
foot of the mast to protect the signalling apparatus from water
condensate and rust particles. This filter is recommended to be
drained regularly, approximately once a month.