SUPERTYFON AT 150/330 is to be fixed with four M16 bolts
to an outrigger or similar construction. To avoid functional trou-
ble blow the supply pipe thoroughly clean before connecting
to the signalling whistle. If the pipe line above deck is longer
than 100m, a primary FILTER TP 15/2 should be installed at the
foot of the mast to protect the signalling apparatus from water
condensate and rust particles. This filter is recommended to
be drained regularly, approximately once a month.