TeamTec original sludge oil tanks ensure an ultimate and safe operation of the incinerators unit. Tanks are delivered in sizes from 435L NET to 3000L NET.
All TeamTec sludge oil tanks are complete with heating coil, sludge circulation pump, high and low level switches, and required safety/operational valves. The tanks can be delivered for heating with steam, electricity or by thermal oil heating (superheated water upon special request). With steam, the energy consumption is estimated to 50 kg/hr at 7 bar. Heating by electricity requires 12kW or 16 kW, depending on tank size.
Sludge tanks may be insulated with 30 mm Rockwool covered with 0,7 mm galvanized steel sheet or aluminium foil insulation
(insulation is mandatory by regulations)
Level transmitter for read out on incinerator display (standard for GS900/GS1000)
Extraction fan for vaporized water from the tank
Larger tanks (Projects versions).
If the client would rather use another tank available, we still need to functionally integrate this with the incinerator. It is very important to be able to drain water, and to heat and mix the sludge before incineration. TeamTec has different packages for steam, electrical or thermal oil heated tanks. Included in the packages are a sludge circulation pump (required), a control panel and a number of fittings and electronic components. All valves required by class are included.